Hadronic EndCap Liquid Argon Detector (shared with the other HEC LARG
institutes):
Design
Module Construction (50%): All wheels have now been constructed.
Module Testing (50%): EndA and EndC have both been cold tested.
Wheel Assembly: All wheels have been assembled.
Installation: Both endcap cryostats were moved from the installation building to the ATLAS Pit at the end of 2005.
Endcap C was lowered down the Pit in December 2005, and Endcap A in April 2006. By March 2007, Endcap A was in operation and Endcap C was cooling.